A Basecamp process in six-week cycles with two weeks off: a small group shapes the work, others bet on it, and a team finishes it.

Origin
Ryan Singer, Basecamp (2019)

What it’s for

To-do lists keep growing, estimates fail, and projects drag on without anyone deciding whether they are still worth it.

Phases

  • Shape

    A small group leaves the idea solved in broad strokes and bounded, by the time it is worth, not by an estimate.

  • Bet

    During the cool-down, decision makers choose which pitches get built next cycle. There is no backlog.

  • Build for six weeks

    A small team with design and programming makes the whole project and adjusts its scope.

  • Stop or continue

    If it is not done in the cycle, it is not extended automatically. It is stopped and decided again.

How it’s done

  1. The idea is shaped with a maximum time, not an estimate.

  2. Bets are placed on some pitches and the rest are dropped.

  3. A team works for six weeks and then there are two weeks off.

Applications in design

  • When to use it

    For a product with a stable team, where it helps to decide what goes in and what stays out of each cycle.

  • Avoid

    Applying it whole without adapting it: it is one company's practice, of a particular size and product.

  • Don’t fall for it

    No studies compare it with other methods: what is told is Basecamp's experience.